- 1.Question : (TCO 11) The component of statistical methodology that includes the collection, organization, and summarization of data is called
descriptive statistics.
probability distribution.
statistical inference.
predictive statistics.
Question 2. Question : (TCO 11) The process of developing predictions about the future based on historical data is
predictive statistics.
descriptive statistics.
inference statistics.
random inference.
Question 3. Question : (TCO 11) Which of the following is not a type of sampling scheme?
Stratified sampling
Biased sampling
Cluster sampling
Judgment sampling
Question 4. Question : (TCO 11) Calculating the variance for 10 lengths of steel is an example of which of the following?
Descriptive statistics
Statistical inference
Predictive statistics
Analytical statistics
Question 5. Question : (TCO 11) If the process mean and variance do not change over time, the process is considered to be
in statistical control.
normally distributed.
stable.
capable.
Question 6. Question : (TCO 12) With respect to Pareto analysis, a Pareto _____ is one in which the characteristics observed are ordered from largest frequency to smallest.
quincunx
histogram
charter
distribution
Question 7. Question : (TCO 12) Data such as production volume, cost, and customer satisfaction indexes are often plotted on a _____, which displays the data over time.
check sheet
control chart
run chart
SIPOC diagram
Question 8. Question : (TCO 12) Attribute data are
discrete.
not measurable.
nonrandom.
continuous.
Question 9. Question : (TCO 12) The _____ is used to monitor the centering of the process.
X-bar chart
R-chart
P-chart
NP-chart
Question 10. Question : (TCO 12) Process capability calculations make little sense if the process
data were taken over a period of time.
is not in statistical control.
variations are due to common causes.
is not initiated.
- 1.Question : (TCO 12) Six samples of subgroup size 7 (n = 7) were collected.Determine the upper control limit (UCL) for an X-bar chart if the mean of the sample averages is 4.7 and the mean of the sample ranges is 0.35.
Factors for calculating control limits
n A2 D3 D4
2 1.880 0 3.267
3 1.023 0 2.574
4 0.729 0 2.282
5 0.577 0 2.114
6 0.483 0 2.004
7 0.419 0 1.924
Question 2. Question : (TCO 12) Twenty samples of subgroup size of 4 (n = 4) were collected for a variable measurement.Determine the upper control limit (UCL) for an R-chart if the mean of the sample ranges equals 4.4.
Factors for calculating control limits
n A2 D3 D4
2 1.880 0 3.267
3 1.023 0 2.574
4 0.729 0 2.282
5 0.577 0 2.114
6 0.483 0 2.004
Question 2. Question : (TCO 2) How do leading CEOs and academia define a TQM
DeVry Courses helps in providing the best essay writing service. If you need 100% original papers for Devry GSCM 326 Week 6 Quiz Latest, then contact us through call or live chat.
Devry GSCM 326 Week 6 Quiz Latest

Reviews
There are no reviews yet.